How to Apply for the Downstream Activity License

1. Downstream Activities License Application Form

Applicants are require to submit  application form  for requesting or renewing downstream activities licenses based on information stipulated under article 10 submission of documents of  Regulation no.2/2014, of 24, October 2014, first amendment to regulation no.1/2012, of 24 October  2012, on administrative procedure, requirement and fees for the granting, renewal, and modification of Downstream activities Licenses.

License FormTypeDownload
Downstream Activities License Application Formword-icon3 Tetun | Portuguese | English

2. Application for the approval of the location

Applicants are require to submit  the request for approval  of the location  of the new or existing  fuel filling station  must be made through  the completion and submission  to the ANP of the form Included In Annex I  of  the regulation number 3 /2014, 24 October. first amendment to regulation number one  No.1/2013, of 18 September  2013 on Installation and operation of Fuel filling Station article 4 “Location approval”.

a. Installation and operation of fuel filling station

Applicants are require to submit  the request for approval  of the location  of the new or existing  fuel filling station and  must be made through  the completion and submission  the form to the ANP Included  Annex I  of  the regulation on Installation and operation of Fuel filling Station.

License FormTypeDownload
Locationword-icon3Tetun | Portuguese | English

b. Installation and operation of storage facilities

Applicants are require to submit  the request for approval  of the location  of the new or existing installation and operation of storage facilities and must be made through  the completion and submission the form to the ANP Included In Annex I regulation  on Installation and operation of storage facilities.

License FormTypeDownload
Locationword-icon3Tetun | Portuguese | English

3. Application for the approval of the project

a. Fuel Filling Station

Upon the Issuance  of the certificate approval of location for fuel filling station, operator of new  or existing  Fuel Filling Station  require  to submit Application for the approval  of the project  for a fuel filling station in the form included annex II  of  the regulation number 3 /2014, 24 October. first amendment to regulation number one  No.1/2013, of 18 September  2013 on Installation and operation of Fuel filling Station article 5 “Project Approval ” .

License FormTypeDownload
Projectword-icon3 Tetun | Portuguese | English

b. Storage Facilities

Upon the issuance  of the certificate approval of location for storage facilities, operator of new  or existing  storage facilities  require  to submit application for the approval  of the project  for a storage facilities  in the form included annex II  of  the regulation on Installation and Operation of Storage Facilities.

License FormTypeDownload
Projectword-icon3Tetun | Portuguese | English

4. Trading Activity

License FormTypeDownload
Downstream Activities License Application Formword-icon3Tetun | Portuguese | English